Case history

INSTALLATION AT ROSSETTO F.LLI

Buildings Trebaseleghe (PD)

Installation of air-handling units at the factory ROSSETTO F.lli in Trebaseleghe (Padua), a leading company in the production of the polyurethane moulds for furniture, armchairs, couches and sofas. The units are installed on the roof of the warehouses and they are equipped with high efficiency heat recovery systems, in line with the latest EcoDesign 2016-2018 norms, complete automation and systems for the heating and cooling of the air connected to the specific working environment to serve. The electronic control is completely integrated in the company supervision system.

REDEMPTORISTEN

Redemptoristen in Gent (Belgium) is an assembly of buildings dedicated to the local Church, featuring a canteen, reading areas and parish offices.

READ MORE